| Document [No., Rev/Draft, Title] |
Send Comments  |
Chapter 1 --- General
Section Z10, General Requirements for All Disciplines/Chapters --
Clarified PE overstamping; added details discussion in specs section; adjustment for new ML level definitions; minor clarifications throughout
Appendix A Technical Baseline Drawings Guidance, R2 -- minor changes
|
Tobin Oruch ,
oruch@lanl.gov,
Phone: 665- 8475
Comments Due:
April 17, 2007 |
Chapter 16 - IBC Building Safety Program -- organization and ML level changes and minor clarifications throughout; significantly changed sections noted below.
Section IBC-GEN - IBC Building Safety General Requirements R1 -- New material qualification section
Appendix A - LANL Building Code (LBC) R1 -- new IBC program personnel qual section
Section IBC-IP - IBC Inspection Process R1 -- ML level changes
Appendix B Test and Inspection Plan Template (Sample) R1 -- major reformat
Appendix E IBC Inspection Final Report -- Sample R1 -- reformat
Appendix G Structural Observation Report (Sample) R0 -- NE
Appendix H Constructor’s Statement of Responsibility R0 -- NEW
Section IBC-FAB - Steel Fabrication Approval Process
Attachment B -- CoC for exempted work -- NEW
|
Tobin Oruch ,
oruch@lanl.gov,
Phone: 665- 8475
Comments Due:
April 17, 2007 |
Chapter 14 - Sustainable Design
Sustainable Design Requirements for Facilities |
Tobin Oruch ,
oruch@lanl.gov,
Phone: 665- 8475
Comment Period Closed
|
Chapter 15, Commissioning, Section Z1045
Attachment A – Commissioning Process
Attachment B – Commissioning Phases
Attachment C – Commissioning Agent Request for Proposal Guideline
Attachment D – Retro-Commissioning
Attachment E – Re-Commissioning
Attachment F – References
Attachment G – Graded Approach Example
|
Mike Clemmons ,
mclemmons@lanl.gov
Phone: 667-8102
Comment Period Closed |