Documents in Review
Please send comments to the POC listed within the "send comments" column. Please use comment form (link provide below).
NOTE: Should you not want track change marks showing, you will need to "Turnoff" track changes found under "Tools".

Please use the following Comment Form for your comments.
Document [No., Rev/Draft, Title]
Send Comments

Chapter 1 --- General

Section Z10, General Requirements for All Disciplines/Chapters --
Clarified PE overstamping; added details discussion in specs section; adjustment for new ML level definitions; minor clarifications throughout
        Appendix A Technical Baseline Drawings Guidance, R2 -- minor changes


Tobin Oruch ,
oruch@lanl.gov,
Phone: 665- 8475

Comments Due:
April 17, 2007

Chapter 16 - IBC Building Safety Program -- organization and ML level changes and minor clarifications throughout; significantly changed sections noted below.

Section IBC-GEN - IBC Building Safety General Requirements R1 -- New material qualification section
            Appendix A - LANL Building Code (LBC) R1 -- new IBC program personnel qual section
     
Section IBC-IP - IBC Inspection Process R1 -- ML level changes
           Appendix B Test and Inspection Plan Template (Sample)  R1 -- major reformat
           Appendix E IBC Inspection Final Report -- Sample R1 -- reformat
           Appendix G  Structural Observation Report (Sample) R0 -- NE
           Appendix H  Constructor’s Statement of Responsibility R0  -- NEW
     
Section IBC-FAB - Steel Fabrication Approval Process
           Attachment B -- CoC for exempted work -- NEW


Tobin Oruch ,
oruch@lanl.gov,
Phone: 665- 8475

Comments Due:
April 17, 2007

Chapter 14 - Sustainable Design
Sustainable Design Requirements for Facilities

Tobin Oruch ,
oruch@lanl.gov,
Phone: 665- 8475

Comment Period Closed

Chapter 15, Commissioning, Section Z1045

Attachment A – Commissioning Process
Attachment B – Commissioning Phases
Attachment C – Commissioning Agent Request for Proposal Guideline
Attachment D – Retro-Commissioning
Attachment E – Re-Commissioning
Attachment F – References
Attachment G – Graded Approach Example

 

Mike Clemmons ,
mclemmons@lanl.gov

Phone: 667-8102

Comment Period Closed