|
These are Mandatory Documents and apply to:
All Lab personnel and subcontracted designers performing engineering services for LANL, both programmatic and facility -- including maintenance and modification of existing equipment and facilities and new facilities and equipment. [ IMP 341.2 ]
Contact Tobin Oruch, Standards Manager
to be notified of any changes to this document set.
Please feel free to send feedback/suggestions to the Discipline POC.
LANL Engineering Standards Scope and Applicability Matrix
[ Last Modification: 28 Feb, 2008 ]
|
Operations & Maintenance Manual [OST 230-05-01]
Please ensure you are using the most current version. It is your responsibility to destroy any outdated copies.
|
|
|
|
|
| |
Engineering Standards Manual |
History [off Chpt pages] |
| Chapter |
Title |
Point-of-Contact |
| |
Introduction |
Tobin Oruch, CENG Stds Mgr |
| Ch. 1 |
General |
Tobin Oruch, CENG Stds Mgr |
| Ch. 2 |
Fire Protection |
Julie Wood, ER-FP |
| Ch. 3 |
Civil |
James Haugen, MSS-UI |
| Ch. 4 |
Architectural |
David Chavez , PE-DO |
| Ch. 5 |
Structural |
Michael Salmon, D-5 |
| Ch. 6 |
Mechanical |
Charles DuPré, ES-DE |
| Ch. 7 |
Electrical |
David Powell, ES-DE |
| Ch. 8 |
Instrumentation & Controls |
Mike L. Clemmons, ES-DE |
| Ch. 9 |
Security |
Robert Gonzales, SEC-PPS1 |
| Ch. 10 |
Hazardous Process |
Mike L. Clemmons,ES-DE |
| Ch. 11 |
Radiation Protection |
Art Crawford, RP-3 |
| Ch. 12 |
Nuclear |
Mel Burnett, ES-SE |
| Ch. 13 |
Welding |
Kelly Bingham, ES-DE |
| Ch. 14 |
Sustainable Design |
Tobin Oruch, CENG Stds Mgr |
| Ch. 15 |
Commissioning [Future] |
James Bodnar, CM-DO |
| Ch. 16 |
IBC Program |
Tobin Oruch, CENG Stds Mgr |
| Ch. 17 |
Pressure Safety |
Charles DuPré, ES-DE |
| |
|
|




| |
LANL Master Specifications |
|
| |
Specifications Index (links to .doc and .pdf files) |
Tobin Oruch, CENG Stds Mgr |
| § 100/200 |
General & Specification Requirements |
|
| |
Spec Crosswalks (no links, for reference use only)
Crosswalk with POC's Sorted by New Spec Number
Crosswalk Sorted by Old Spec Number
|
Superceded Archived Specs:
|
MasterFormat2004 Conversion Notice
In February 2006 the LANL Master Specs were renumbered/retitled to conform to CSI's new 50-division system.
The new specs all started at Rev 0 and have a spec date of 1/6/06 or later. The new spec numbers are 6- or 8-digits and are segmented; e.g., 31 2000 and 31 2323.33 are Div 31 specs. They should be used for projects that start after 3/1/06.
Crosswalks -- to locate a new spec using its old number (and visa-versa) -- are provided on this webpage. Also available by clicking on the link are the Old spec versions (dating back a few years) .
The Rev 0 specs dated 1/6/2006 are technically identical to their superseded, pre-2006 ancestors. Two exceptions: the specs on Filters and Surge Protective Devices were split up into two separate specs addressing dissimilar parts of the original spec scope (see crosswalk for mapping), and other technical changes were made.
Additional spec splitting may occur in the future -- e.g., since there are now multiple mechanical divisions, each may get a spec on hangers and supports versus the single spec that was put in the division where it is most used.
|









END
Los Alamos National Laboratory . Est. 1943
|