Number
|
Rev |
|
Spec Title |
Effective |
Discipline POC (Primary/Secondary) |
| GENERAL REQUIREMENTS |
|
| 01 1116 |
1 |
|
Work by Owner |
04/14/08 |
General |
| 01 2500 |
1 |
|
Substitution Procedures |
04/14/08 |
General |
| 01 3300 |
3 |
|
Submittal Procedures |
06/25/09 |
General |
| 01 3545 |
6 |
|
Water Discharge Requirements |
01/30/13 |
General |
| 01 4000 |
4 |
|
Quality Requirements |
09/01/09 |
General |
| 01 4200 |
3 |
|
References (Supersedes 01 4219) |
01/30/13 |
General |
| 01 4444 |
0 |
|
Offsite Welding and Joining Requirements |
09/01/09 |
Welding |
| 01 4455 |
0 |
|
Onsite Welding and Joining Requirements |
09/01/09 |
Welding |
| 01 5705 |
4 |
|
Temporary Controls and Compliance Requirements |
12/12/12 |
Civil |
| 01 6000 |
1 |
|
Product Requirements |
04/14/08 |
General |
| 01 7700 |
1 |
|
Closeout Procedures |
04/14/08 |
General |
| 01 7839 |
2 |
|
Project Record Documents |
04/14/08 |
General |
| EXISTING CONDITIONS |
|
| 02 4115 |
2 |
|
Electrical Demolition |
12/14/09 |
Electrical |
| 02 4119 |
1 |
|
Selective Structure Demolition |
04/23/08 |
General |
| CONCRETE |
|
| 03 1512 |
3 |
|
Post Installed Concrete Anchors -High Confidence |
04/23/12 |
Structural |
| 03 1534 |
5 |
|
Post Installed Concrete Anchors -Normal Confidence |
09/18/12 |
Structural |
| 03 1550 |
- |
|
Post Installed Concrete Anchors - Installation and Testing
NOTE: The installation and testing section was incorporated into 03 1512 and 03 1534. |
- |
|
| 03 3001
|
|
|
Reinforced Concrete
- IDED-STD-03_3001 Reinforced Concrete Commercial Grade Dedication (CGD) Package/Traveler , Rev. 0 [12/22/10]
- VAR-2012-066 - Labwide Ext Concrete Strength and Durability per IBC 2009
- VAR-2012-139 - Exterior Concrete Strength and Durability per IBC 2009 |
08/30/12
|
Structural
|
| 03 3053 |
6 |
|
Miscellaneous Cast-In-Place Concrete |
10/25/12 |
Civil |
| 03 4100 |
0 |
|
Precast Structural Concrete |
11/15/12 |
Structural |
| 03 6000 |
0 |
|
Grout |
04/23/12 |
Structural |
| MASONRY |
Top of page |
| 04 2220 |
0 |
|
Reinforced Unit Masonry |
09/18/08 |
Structural |
| METALS |
|
| 05 1000 |
7 |
|
Structural Metal Framing |
04/24/13 |
Structural |
| 05 1305 |
1 |
|
Stainless Steel |
05/01/08 |
Structural |
| 05 2100 |
3 |
|
Steel Joist Framing |
04/23/12 |
Structural |
| 05 3000 |
2 |
|
Metal Decking |
02/11/13 |
Structural |
| 05 4000 |
3 |
|
Cold-Formed Metal Framing |
06/03/13 |
Structural |
| 05 5000 |
3 |
|
Metal Fabrications |
04/23/12 |
Structural |
| 05 5213 |
1 |
|
Pipe and Tube Railing |
04/23/12 |
Structural |
| 05 5350 |
3 |
|
Gratings and Floor Plates |
08/30/12 |
Structural |
| WOOD, PLASTICS, AND COMPOSITES |
Top of page |
| 06 1000 |
2 |
|
Rough Carpentry |
11/28/12 |
Architectural |
| 06 2000 |
1 |
|
Finish Carpentry |
05/01/08 |
Architectural |
| 06 4100 |
1 |
|
Architectural Wood Casework |
05/01/08 |
Architectural |
| THERMAL AND MOISTURE PROTECTION |
Top of page |
| 07 0150.19 |
2 |
|
Preparation for Re-Roofing |
12/09/09 |
Architectural |
| 07 0155 |
2 |
|
Roof Patching |
12/17/09 |
Architectural |
| 07 1113 |
2 |
|
Bituminous Dampproofing |
07/18/12 |
Architectural |
| 07 1326 |
0 |
|
Self-Adhering Sheet Waterproofing |
07/18/12 |
Architectual |
| 07 2100 |
2 |
|
Thermal Insulation |
01/19/10 |
Architectural |
| 07 2400 |
2 |
|
Exterior Insulation and Finish Systems |
12/18/12 |
Architectural |
| 07 4113 |
3 |
|
Metal Roof Panels |
02/18/10 |
Architectural |
| 07 5050 |
1 |
|
Membrane Roofing General Provisions |
05/05/08 |
Architectural |
| 07 5213.13 |
0 |
|
Atatic-Polypropylene Modified-Bitumen Roofing, Cold-Applied |
03/08/10 |
Architectural |
| 07 5216 |
2 |
|
Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing |
03/29/10 |
Architectural |
| 07 5217 |
0 |
|
Styrene-Butadiene-Styrene Modified-Bituminous Membrane Roofing, Cold-Applied |
03/29/10 |
Architectural |
| 07 5316 |
2 |
|
Chlorosulfonate-Polyethylene Roofing |
06/26/12 |
Architectural |
| 07 6200 |
3 |
|
Sheet Metal Flashing and Trim |
01/19/10 |
Architectural |
| 07 7100 |
2 |
|
Roof Specialties |
07/26/12 |
Architectural |
| 07 7233 |
2 |
|
Roof Hatches |
05/05/08 |
Architectural |
| 07 7600 |
2 |
|
Roof Pavers |
05/05/08 |
Architectural |
| 07 8400 |
3 |
|
Firestopping |
09/05/12 |
Fire |
| 07 9200 |
3 |
|
Joint Sealants |
08/09/12 |
Architectural |
| OPENINGS |
Top of page |
| 08 1100 |
1 |
|
Metal Doors and Frames |
05/12/08 |
Architectural |
| 08 1213 |
2 |
|
Hollow Metal Frames |
05/12/08 |
Architectural |
| 08 1400 |
2 |
|
Wood Doors |
05/12/08 |
Architectural |
| 08 3100 |
2 |
|
Access Doors and Panels |
05/12/08 |
Architectural |
| 08 3323 |
2 |
|
Overhead Coiling Doors |
05/12/08 |
Architectural |
| 08 4113 |
2 |
|
Aluminum-Framed Entrances and Storefronts |
05/12/08 |
Architectural |
| 08 5113 |
2 |
|
Aluminum Windows |
05/12/08 |
Architectural |
| 08 7100 |
2 |
|
Door Hardware |
05/12/08 |
Architectural |
| 08 8000 |
2 |
|
Glazing |
05/12/08 |
Architectural |
| 08 9100 |
2 |
|
Louvers |
05/12/08 |
Arch/Mech |
| FINISHES |
Top of page |
| 09 2116 |
2.1 |
|
Gypsum Board Systems |
04/04/12 |
Architectural |
| 09 2913 |
1 |
|
Gypsum Roof Board |
05/14/08 |
Architectural |
| 09 3013 |
1 |
|
Ceramic Tiling |
05/14/08 |
Architectural |
| 09 5100 |
2 |
|
Acoustical Ceilings |
07/23/12 |
Architectural |
| 09 6500 |
3 |
|
Resilient Flooring |
12/09/09 |
Architectural |
| 09 6813 |
1 |
|
Tile Carpeting |
05/14/08 |
Architectural |
| 09 6816 |
1 |
|
Sheet Carpeting |
05/14/08 |
Architectural |
| 09 6900 |
1 |
|
Access Flooring |
08/30/12 |
Architectural |
| 09 9100 |
3 |
|
Painting (Note: May take a few seconds to open) |
12/09/09 |
Architectural |
| SPECIALTIES |
Top of page |
| 10 1100 |
1 |
|
Visual Display Surfaces |
05/16/08 |
Architectural |
| 10 1405 |
2 |
|
Signage, Exterior |
01/13/10 |
Architectural |
| 10 1410 |
2 |
|
Signage, Interior |
01/13/10 |
Architectural |
| 10 2113.13 |
1 |
|
Metal Toilet Compartments |
05/16/08 |
Architectural |
| 10 2800 |
2 |
|
Toilet & Bath Accessories |
07/24/12 |
Architectural |
| 10 4400 |
1 |
|
Fire Protection Specialties |
05/16/08 |
Fire |
| 10 5113 |
1 |
|
Metal Lockers |
05/16/08 |
Architectural |
| EQUIPMENT |
Top of page |
| 11 1313 |
1 |
|
Loading Dock Bumpers |
05/19/08 |
Architectural |
| 11 5311.08 |
1 |
|
Glovebox Design |
05/19/08 |
Mechanical |
| 11 5311.10 |
2 |
|
Glovebox Fabrication |
02/27/13 |
Mechanical |
| 11 5311.12 |
2 |
|
Glovebox Installation |
10/14/09 |
Mechanical |
| 11 5311.14 |
1 |
|
Glovebox Gloves |
05/19/08 |
Mechanical |
| 11 5311.16 |
1 |
|
Glovebox Feedthroughs, Hermetically Sealed |
05/19/08 |
Electrical |
| 11 5311.17 |
1 |
|
Glovebox Instrumentation |
05/19/08 |
I&C |
| 11 5311.18 |
1 |
|
Glovebox Atmosphere Regenerable Purification Systems |
05/19/08 |
Mechanical |
| 11 5311.19 |
0 |
|
Chemical Resistant Coatings for Gloveboxes |
03/13/13 |
Architectural |
| FURNISHINGS |
Top of page |
| 12 2113 |
1 |
|
Horizontal Louver Blinds |
05/20/08 |
Architectural |
| 12 3100 |
3 |
|
Manufactured Metal Casework |
08/30/12 |
Architectural |
| SPECIAL CONSTRUCTION |
Top of page |
| 13 3419 |
2b |
|
Metal Building Systems |
03/05/10 |
Struct/Arch |
| 13 4800 |
2 |
|
Sound, Vibration, and Seismic Control |
08/24/09 |
Structural |
| CONVEYING EQUIPMENT |
Top of page |
| 14 2413 |
1 |
|
Hydraulic Freight Elevators |
05/28/08 |
Arch/Mech |
| 14 2423 |
1 |
|
Hydraulic Passenger Elevators |
05/28/08 |
Arch/Mech |
| FIRE SUPPRESSION |
Top of page |
| 21 1313 |
5 |
|
Wet-Pipe Sprinkler Systems |
05/29/12 |
Fire |
| 21 1316 |
4 |
|
Dry-Pipe Sprinkler Systems |
05/29/12 |
Fire |
| 21 1319 |
4 |
|
Preaction Sprinkler Systems |
05/29/12 |
Fire |
| 21 1326 |
4 |
|
Deluge Fire-Suppression Sprinkler Systems |
05/29/12 |
Fire |
| 21 1339 |
4 |
|
Foam-Water Systems |
05/29/12 |
Fire |
| 21 2200 |
2 |
|
Clean Agent Fire-Extinguishing Systems |
05/29/12 |
Fire |
| PLUMBING |
Top of page |
| 22 0529 |
3 |
|
Hangers and Supports for Plumbing Piping and Equipment |
09/01/09 |
Mechanical |
| 22 0535 |
0 |
|
Electric Heat Tracing Systems |
10/01/09 |
Mechanical |
| 22 0548 |
2 |
|
Vibration and Seismic Controls for Plumbing Piping and Equipment |
09/14/09 |
Structural |
| 22 0554 |
2 |
|
Identification for Plumbing, HVAC, and Fire Piping and Equipment |
06/04/09 |
Mechanical |
| 22 0713 |
4 |
|
Plumbing and HVAC Insulation |
09/01/09 |
Mechanical |
| 22 0813 |
6 |
|
Testing Piping Systems |
08/14/12 |
Mechanical |
| 22 0816 |
4 |
|
Disinfection of Potable Water Piping [also 33 1300] |
09/25/12 |
Civil |
| 22 1100 |
3 |
|
Facility Water Distribution |
09/15/09 |
Mechanical |
| 22 1316 |
3 |
|
Sanitary Waste and Vent Piping |
09/23/09 |
Mechanical |
| 22 1343.16 |
2 |
|
Facility Wet-Well Packaged Sewage Pumping Stations (Interior) |
08/05/10 |
Mechanical |
| 22 1413 |
2 |
|
Facility Storm Drainage Piping |
09/23/09 |
Mechanical |
| 22 1500 |
3 |
|
Compressed-Air Systems |
09/01/09 |
Mechanical |
| 22 3700 |
0 |
|
Domestic Water Heaters |
02/14/11 |
Mechanical |
| 22 4200 |
5 |
|
Plumbing Fixtures |
07/25/12 |
Mechanical |
| HVAC |
Top of page |
| 23 0593 |
3 |
|
Testing, Adjusting, and Balancing for HVAC |
09/15/09 |
Mechanical |
| 23 1123 |
3 |
|
Facility Natural-Gas Piping |
03/31/10 |
Mechanical |
| 23 2113 |
4 |
|
Hydronic Piping |
09/01/09 |
Mechanical |
| 23 2215 |
0 |
|
Steam and Condensate Heating Piping and Specialties |
09/23/09 |
Mechanical |
| 23 2300 |
2 |
|
Refrigerant Piping |
09/15/09 |
Mechanical |
| 23 2500 |
2 |
|
HVAC Water Treatment |
09/01/09 |
Mechanical |
| 23 3101 |
0 |
|
HVAC Ducts |
09/01/09 |
Mechanical |
| 23 3225 |
2 |
|
Bag-in Bag-out Housings |
11/03/11 |
Mechanical |
| 23 3300 |
0 |
|
Air Duct Accessories |
06/01/10 |
Mechanical |
| 23 3400 |
0 |
|
HVAC Fans |
11/23/10 |
Mechanical |
| 23 3816 |
2 |
|
Fume Hoods |
07/29/09 |
Mechanical |
| 23 4133 |
2 |
|
High Efficiency Particulate Filtration |
10/17/11 |
Mechanical |
| 23 6200 |
0 |
|
Packaged Compressor and Condenser Units |
07/20/10 |
Mechanical |
| 23 6509 |
1 |
|
Induced-Draft Cooling Towers--Steel |
06/11/08 |
Mechanical |
| 23 6511 |
1 |
|
Induced-Draft Cooling Towers--Fiberglass |
06/11/08 |
Mechanical |
| 23 7300 |
0 |
|
Indoor Central-Station Air Handling Units |
05/19/10 |
Mechanical |
| 23 7413 |
2 |
|
Packaged, Outdoor, Central Station |
09/01/09 |
Mechanical |
| 23 8123 |
0 |
|
Computer-Room Air-Conditioners |
11/23/10 |
Mechanical |
| 23 8239 |
0 |
|
Unit Heaters |
02/14/11 |
Mechanical |
| INTEGRATED AUTOMATION |
Top of page |
| 25 5000 |
1 |
|
Integrated Automated Facility Controls |
06/11/08 |
I&C |
| ELECTRICAL |
Top of page |
| 26 0519 |
4 |
|
Low Voltage Electrical Power Conductors and Cables |
05/06/09 |
Electrical |
| 26 0526 |
1 |
|
Grounding and Bonding for Electrical Systems |
07/23/08 |
Electrical |
| 26 0529 |
4 |
|
Hangers and Supports for Electrical Systems |
08/30/12 |
Electrical |
| 26 0533 |
4 |
|
Raceway and Boxes for Electrical Systems |
01/05/12 |
Electrical |
| 26 0536 |
2 |
|
Cable Trays for Electrical Systems |
10/01/09 |
Electrical |
| 26 0548 |
2 |
|
Vibration and Seismic Controls for Electrical Systems |
08/30/12 |
Electrical |
| 26 0553 |
2 |
|
Identification for Electrical Systems |
05/25/11 |
Electrical |
| 26 0700 |
2 |
|
Induction Motors-500HP and Smaller |
06/29/10 |
Electrical |
| 26 0813 |
1 |
|
Electrical Acceptance Testing |
07/08/08 |
Electrical |
| 26 2213 |
2 |
|
Low Voltage Distribution Transformers |
09/24/09 |
Electrical |
| 26 2300 |
2 |
|
Low-Voltage Switchgear |
09/16/09 |
Electrical |
| 26 2413 |
3 |
|
Switchboards |
08/03/09 |
Electrical |
| 26 2416 |
2 |
|
Panelboards |
08/03/09 |
Electrical |
| 26 2419 |
3 |
|
Motor Control Centers |
09/14/09 |
Electrical |
| 26 2500 |
2 |
|
Enclosed Bus Assemblies |
09/28/09 |
Electrical |
| 26 2713 |
3 |
|
Electricity Metering |
01/11/10 |
Electrical |
| 26 2726 |
4 |
|
Wiring Devices |
11/10/11 |
Electrical |
| 26 2816 |
3 |
|
Enclosed Switches and Circuit Breakers |
12/15/09 |
Electrical |
| 26 2913 |
2 |
|
Enclosed Controllers |
06/09/11 |
Electrical |
| 26 2923 |
2 |
|
Variable Frequency Motor Controllers |
01/12/10 |
Electrical |
| 26 3334 |
0 |
|
Stored Emergency Power Supply System |
12/12/11 |
Electrical |
| 26 3353 |
1 |
|
Static Uninterruptible Power Supply |
07/23/08 |
Electrical |
| 26 4100 |
1 |
|
Facility Lightning Protection |
07/23/08 |
Electrical |
| 26 4115 |
1 |
|
Lightning Protection for Explosive Facilities |
07/23/08 |
Electrical |
| 26 4300 |
0 |
|
Surge Protective Devices |
06/06/11 |
Electrical |
| 26 5100 |
4 |
|
Interior Lighting |
11/29/11 |
Electrical |
| 26 5200 |
5 |
|
Emergency Lighting |
11/03/11 |
Electrical |
| 26 5600 |
4 |
|
Exterior Lighting |
11/10/11 |
Electrical |
| COMMUNICATIONS |
Top of page |
| 27 1000 |
3 |
|
Structured Cabling |
07/01/08 |
Electrical |
| 27 1500.18 |
1 |
|
Protected Transmission System Rough-In |
07/01/08 |
Electrical |
| 27 3000 |
3 |
|
Voice Communications |
07/01/08 |
Electrical |
| ELECTRONIC SAFETY AND SECURITY |
Top of page |
| 28 0528 |
3 |
|
Pathways for Electronic Security |
11/08/11 |
Electrical/Security |
| 28 1321 |
3 |
|
Administrative Access Control System Rough-In |
11/08/11 |
Electrical |
| 28 3100 |
6 |
|
Fire Detection and Alarm |
10/03/12 |
Fire/Electrical |
| 28 3110 |
2 |
|
Fire Detection and Alarm-Addition to Existing |
08/18/11 |
Fire/Electrical |
| EARTHWORK |
Top of page |
| 31 2000 |
5 |
|
Earth Moving
CIR-2012-007 - Clarification -Backfill Material Placement and Compaction Below 35 Degrees |
01/25/11 |
Civil |
| 31 2323.33 |
5 |
|
Flowable Fill |
08/27/12 |
Civil |
| EXTERIOR IMPROVEMENTS |
Top of page |
| 32 1216 |
3 |
|
Asphalt Paving |
10/25/12 |
Civil |
| 32 3100 |
2 |
|
Fences and Gates |
08/13/09 |
Civil |
| 32 3113 |
3 |
|
Chain Link Fences and Gates |
01/30/13 |
Civil |
| 32 8400 |
3 |
|
Planting Irrigation |
10/07/09 |
Civil |
| 32 9219 |
3 |
|
Seeding |
12/23/09 |
Civil/Arch |
| 32 9223 |
3 |
|
Sodding |
09/28/09 |
Civil/Arch |
| 32 9300 |
4 |
|
Plants |
08/27/12 |
Civil/Arch |
| UTILITIES |
Top of page |
| 33 0513 |
6 |
|
Manholes and Structures |
08/27/12 |
Civil |
| 33 1000 |
6 |
|
Water Utilities |
06/03/13 |
Civil |
| 33 1300 |
4 |
|
Disinfecting of Water Utility Distribution [22 0816] |
09/25/12 |
Civil |
| 33 3000 |
6 |
|
Sanitary Sewerage Utilities |
08/28/12 |
Civil |
| 33 3200 |
6 |
|
Wastewater Utility Pumping Stations |
02/24/11 |
Civil |
| 33 4000 |
3 |
|
Storm Drainage Utilities |
08/28/12 |
Civil |
| 33 5100 |
9 |
|
Natural-Gas Distribution |
11/29/12 |
Civil |
| 33 6300 |
4 |
|
Steam Energy Distribution |
11/16/09 |
Civil |
| 33 7119 |
3 |
|
Electrical Underground Ducts and Manholes |
01/05/12 |
Electrical |
| 33 7311 |
3 |
|
Pad-Mounted Transformer Rough-In |
08/28/12 |
Electrical |
| 33 7711 |
3 |
|
Pad-Mounted Switch Rough-In |
08/28/12 |
Electrical |
| PROCESS INTEGRATION |
Top of page |
| 40 0511 |
1 |
|
Compression Fittings on Copper and Stainless Steel Tubing |
07/17/08 |
Mechanical |
| 40 0513 |
0 |
|
Process Piping |
07/25/12 |
Mechanical |
| 40 0527 |
2 |
|
Piping and Tubing Inspection Checklist |
10/05/09 |
Mechanical |
| MATERIAL PROCESSING AND HANDLING EQUIPMENT |
Top of page |
| 41 2213.13 |
2 |
|
Bridge Cranes |
11/18/09 |
Mech/Struc |
| 41 2225 |
1 |
|
Hoist and Trolleys |
07/17/08 |
Mech/Struc |
| PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT |
Top of page |
| 43 3113.37 |
1 |
|
High Efficiency Gas Purification Filters |
07/17/08 |
Mechanical |
| 43 4113 |
1 |
|
Gas and Liquid Pressure Vessels |
07/17/08 |
Mechanical |
| 43 4116 |
1 |
|
Atmospheric Tanks and Vessels |
07/17/08 |
Mechanical |